• ENGLISH
  • ESPAÑOL
facebook
twitter
  • National>Entertainment
  • National>Local Economics
  • National>Local Politics
  • National>Society
  • National>Sports
BREAKING NEWS
Cristian Espinosa was appointed Ambassador of Ecuador to the United States
Daniel Noboa receives the credentials of the new United States ambassador
40,000 women will receive scholarships in higher education
Julian Assange released from prison, after agreement with the United States
Armed Forces: Criminal gangs have lost USD 1.2 billion due to military operations in Ecuador
Minister of Defense: “It is not fair that some risk their lives, while others play with justice”
How can green banana flour enhance baked goods?
“I’m crazy for wanting to serve my country,” says Daniel Noboa at the presentation of “La Cárcel del Encuentro” in Santa Elena
Construction of the Encuentro maximum-security prison in Santa Elena begins
National blackout in Ecuador due to transmission line failure, confirms the Government

General State Comptroller rejects denounce on hydroelectric press

Posted On 24 Sep 2015

hidroelectrica-ecuadortimes-ecuadornewsThe Comptroller General Carlos Polit, yesterday rejected the complaint of the National Anti-Corruption Commission -agency formed by twelve citizens- concerning an alleged loss for the state in the construction of hydroelectric press Maduriacu, located between Imbabura and Pichincha.

On Tuesday, the commission denounced an alleged overpricing in the construction of this hydro press, in charge of the Brazilian transnational Odebrecht.

 

This is the first investigation released of this agency, and it claims that the original contract was signed for $ 124’881.250, but in the end it would have “doubled to $ 227’389.966,63.”

 

Jorge Rodriguez, representative of this group and former member of the extinct Commission for Civic Control of Corruption, said that this would represent an “additional 82%” in its cost. He complained that the dam would be producing only 10 megawatts, of the 60 offered by the government.

 

According to the Comptroller, in this construction three additional contracts would have been signed for $ 40’220.086,22, representing 32.2%, so the commission would be “mistakenly calculating.”

 

Source: http://www.eluniverso.com/noticias/2015/09/24/nota/5144423/contralor-rechaza-denuncia-sobre-hidroelectrica

 

About the Author
  • google-share
Previous Story

Assemblywoman Lourdes Tiban denounces physical and verbal attacks near her office

Next Story

76% of jobs are generated by the private sector

SEARCH

LATEST NEWS

ecuadortimes-cristian-espinosa-was-appointed-ambassador-of-ecuador-to-the-united-states_cristian-espinosa-fue-nombrado-embajador-de-ecuador-en-estados-unidos

Cristian Espinosa was appointed Ambassador of Ecuador to the United States

Posted On 28 Jun 2024
ecuadortimes-daniel-noboa-receives-the-credentials-of-the-new-united-states-ambassador_daniel-noboa-recibe-las-cartas-credenciales-del-nuevo-embajador-de-estados-unidos

Daniel Noboa receives the credentials of the new United States ambassador

Posted On 27 Jun 2024
40-000-mujeres-recibiran-becas-en-educacion-superior

40,000 women will receive scholarships in higher education

Posted On 26 Jun 2024
Copyright © 2010 - 2019. All Rights Reserved. EcuadorTimes.net